The City of Auburn is issuing a Notice of Application (NOA) and Determination of Non-Significance (DNS) for the following described project. 

Proposal: Peninsula Truck Lines proposes to pave approximately 1.5 acres of an existing gravel area located in the rear (north) portion of their 6.2-acre site and facility within Auburn, WA. As part of their project, an underground stormwater detention facility with associated catch basins, storm drain pipes, and outlet flow control will be constructed, and approximately 890 square feet of wetland buffer will be restored.

Location: The project site is located at 701 6th St. NW within NE ¼ of Section 13, Township 21, Range 4. King County Assessor Parcel Nos. 1321049082, 1221049030, and 1321049002.

Notice of Application: July 20, 2019
Application Complete: April 26, 2019  
Permit Application: April 12, 2019

File Nos. SEP19-0013

Applicant: Jake Lye, Regional Manager
   Peninsula Truck Lines, Inc.
   PO Box 587
   Auburn, WA 98071

Applicant’s Representative: Joe Callaghan, Principal
   GeoEngineers, Inc.
   1101 S Fawcett Ave., Suite 200
   Tacoma, WA 98402

Property Owner: ADC Associates
   1630 43rd Ave. E, Suite 1214
   Seattle, WA 98112

Studies/Plans Submitted With Application:

Other Permits, Plans, and Approvals Needed:

  • Grading Permit: GRA17-0004
  • Department of Ecology’s Construction Stormwater Permit
  • City of Auburn Level 3 Stormwater Permit
  • Boundary Line Elimination 

Statement of Consistency and List of Applicable Development Regulations:  This proposal is subject to and shall be consistent with the Auburn City Code, Comprehensive Plan, and Public Works Design and Construction Standards.

Lead Agency: City of Auburn
The lead agency for this proposal has determined that it does not have probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. 

Public Comment Period: This may be your only opportunity to comment on the environmental impact of the proposal. All persons may comment on this application. This DNS is issued under WAC 197-11-355; the lead agency will not act on this proposal for 15 days from the date issued below. Comments must be in writing and submitted by 5:00 PM on August 5, 2019 to the mailing address of 25 W Main St., Auburn, WA, 98001, or to the email below. Any person wishing to become a party of record, shall include in their comments that they wish to receive notice of and participate in any hearings, if relevant, and request a copy of decisions once made.

Appeal Period: Any person aggrieved of the City's determination may file an appeal with the Auburn City Clerk at 25 W Main St., Auburn, WA 98001- 4998 within 14 days of the close of the comment period, or by 5:00 PM on August 19, 2019.

For questions regarding this project, please contact Alexandria Teague, Planner II, at planning@auburnwa.gov or 253-931-3088.