Capital Project Notices

Notice of Road Work

CP2409 Jornada Park Access Improvements (PDF)

Project Limits:

Jornada Park. Please see the map on the reverse side of this flyer.

Project Description:

This project will construct an access driveway at Jornada Park for maintaining onsite underground utilities.

Schedule:

Construction is scheduled to begin in November 2024 and is anticipated to be completed in December 2024.

Additional Information:

We are dedicated to causing as little impact to you as possible however, there will be traffic impacts and noise caused by construction activities.

Access to your residence/business will remain open during the project.

Thank you in advance for your patience and cooperation while we work to construct this access driveway at Jornada.

Contact Information:

If you have any questions, concerns or need more information, please contact:

Samim Qayoomi, City of Auburn Project Manager at 253-358-5306

Greg Sandall, City of Auburn Construction Inspector at 253-261-1621

Dustin Holmes, Contractor Representative for Stafford Excavating at 253-306-8458

Notice

Notice Map

Notice of Construction

Project Limits:

5th St NE between A St NW and Auburn Ave. Please see the map on the reverse side of this flyer.

Project Description:

This project will construct missing sections of sidewalk along 5th Street NE and install new commercial and residential driveways as well.

Schedule:

Construction is scheduled to begin on October 3, 2024 and is anticipated to be completed October 16, 2024.

Additional Information:

We are dedicated to causing as little impact to you as possible however, there will be traffic impacts and noise caused by construction activities.

Access to your residence/business will remain open during the project.

Thank you in advance for your patience and cooperation while we work to improve pedestrian access along 5th St NE.

Contact Information:

If you have any questions, concerns or need more information, please contact:

Lauren E. Kirk, City of Auburn Project Manager at 253-470-2134.

Greg Sandall, City of Auburn Construction Inspector at 253-876-1970.

Dustin Wright, Contractor Representative for Reed Trucking and Excavating at 253-841-4837.Notice

MS2403-2


Notice of Road Work

Project Limits:

Auburn Avenue/4th Street NE between 3rd Street NE and Auburn Way N.  Please see the map on the reverse side of this flyer.

Project Description:

This project will replace outdated infrastructure and introduce a host of improvements designed to enhance traffic flow and safety.  The upgrades will address current deficiencies and bring the area up to the City’s downtown design standards.  

Key components of the project include:

  • Utility Replacements.  Portions of the existing water, sewer, and storm drainage lines will be replaced.
  • Improved Curb Radii.
  • New Pavement and Wider Sidewalks.
  • Upgraded Traffic Signals and Street Lighting.
  • New Pedestrian Crossing.  A new north/south pedestrian crossing will be installed at the 3rd Street NE/Auburn Avenue intersection.
  • New Left Turn Lane.  A dedicated left turn lane will be added for northbound traffic on Auburn Avenue turning onto westbound 3rd Street NE.
  • Reconfigured Traffic Lanes.  Traffic lanes on 4th Street NE intersection will be reconfigured to improve the efficiency of the traffic signal at Auburn Way N and 4th Street NE.

Schedule:

Construction is scheduled to begin on September 24, 2024 and is anticipated to be completed in August 2025.

Additional Information:

We are dedicated to causing as little impact to you as possible. However, there will be traffic impacts and noise caused by construction activities.

Access to your residence/business will remain open during the project.

Street closure will be necessary during some of the work. We will provide advance notice of these closures approximately two weeks before they occur.

Contact Information:

If you have any questions, concerns or need more information, please contact:

Seth Wickstrom, City of Auburn Project Manager at 253-804-5034

Taylor Fay, City of Auburn Construction Inspector at 253-804-5038

Mike Field, Contractor Representative for Ceccanti at 253-327-4424

Chris Warner, Contractor Representative for Ceccanti at 253-255-5793

CP2110 Regional Growth Center Access Improvements

CP2110 Regional Growth Center Access Improvements


Improvement Projects Notice: R Street SE

Work is underway on three projects that will address traffic congestions, safety, and other infrastructure issues on R Street SE between 17th Street SE and the White River: 

  • R Street SE Preservation - 33rd Street SE to White River Bridge (NOW UNDER CONSTRUCTION)
  • R Street SE / 21st Street SE Roundabout (CONSTRUCTION IN 2026)
  • R Street SE Widening - 22nd Street SE to 33rd Street SE (CONSTRUCTION IN 2026/2027)

The R Street SE projects webpage will allow you to click on a location icon or a project name along R Street SE to learn more about each project. You may also complete a short survey at the end of the page. 

Webpage: www.auburnwa.gov/RStreetSEProjects

If you are unable to access the website and have any questions, concerns or need more information, please contact: 

Kim Truong, Project Engineer at 253-804-5059 or [email protected]

R Street SE Projects Flyer

R Street SE Projects Flyer


Construction Notice: Auburn Avenue Theater Demolition (CP2406)

Project Limits:

NE Corner of East Main Street and Auburn Avenue

Project Description:

The project will demolition the Auburn Ave Theater building that includes removal and disposal of hazardous materials from the building, severance of existing utilities serving the building.

Schedule:

Demolition is scheduled to begin on September 3, 2024, through the end of October 2024. 

Additional Information:

We are dedicated to causing as little impact to you as possible however, there will be traffic impacts and noise caused by construction activities. During the demolition, the sidewalk and on-street parking along north side of E Main St, the sidewalk along the east side of Auburn Ave, and the alleyway north of the theater will all be closed (pink area). Pedestrian detours will be in place and parking closure notices will be provided at least 72 hours in advance.

Thank you for your patience and cooperation while we perform this work. 

Contact Information:

If you have any questions, concerns or need more information, please contact:

Samim Qayoomi, City of Auburn Project Manager at 253-285-7013

Seth Loop, City of Auburn Construction Manager at 253-804-5082

Alex Mullendore, Rivers Edge Environmental Services at 206-225-3965

Auburn Avenue Theater Demolition (CP2406)


Notice of Road Work:

Street SE Preservation – 33rd St SE to 37th Way SE (CP2315) 

Project Limits:

R Street SE between 33rd St SE and 37th Way SE (White River Bridge).  Please see the map on the flyer.

Project Description:

The City of Auburn will begin construction to grind and overlay the pavement on R Street SE between 33rd Street SE and the White River Bridge. The project will include:

  • A new 12-foot wide multi-use pathway on the east side of the street
  • A new 7-foot wide sidewalk on the west side
  • A three-lane roadway with a center two-way left turn lane

The revised roadway and multi-use pathway will improve side street access and safety for non-motorized users in the corridor.

Schedule:

Construction is anticipated to start in Spring 2024 and continue through Fall 2024.

Additional Information:

Work hours will primarily occur from Monday through Friday, between 7:00 AM and 7:00 PM.

Traffic lanes will be shifted during construction. Between 9:00 AM and 2:00 PM, traffic may be reduced to a single alternating lane during portions of the project. Outside of that time period, two lanes of traffic will be maintained.

Posted speed limits during the project construction will be reduced throughout the work zone. Please pay attention to speed limits for the safety of our workers!

We are dedicated to causing as little impact to you as possible, however, there will be traffic impacts and noise caused by construction activities.

Access to your residence will remain open during the project. If you have issues accessing your residence, please discuss it with the contractor’s representative onsite or contact one of the individuals listed below. 

Contact Information:

Kim Truong, City of Auburn Project Engineer at 253-804-5059
Jamie Roberts, City of Auburn Construction Inspector at 253-804-5085

Project Limits:

S. Division Street and A Street SE between 3rd Street SW and 4th Street SW. Please see the map on the reverse side of this flyer.

CP2153 - R Street SW Preservation Notice


Para obtener este aviso en español, visite la página web de la ciudad de Auburn en: www.auburnwa.gov/CapitalProjectNotices

Чтобы получить это уведомление на русском языке, посетите веб-страницу города Оберн по адресу: www.auburnwa.gov/CapitalProjectNotices

要获得此中文通知,请访问奥本市的网⻚:www.auburnwa.gov/CapitalProjectNotices

この通知を日本語で入手するには、オーバーン市のWebページ(www.auburnwa.gov/CapitalProjectNotices)にアクセスしてください